PENGUMUMAN JASA PENGGANTIAN LINE PIPA PENDINGIN (BOOSTER PUMP) CWP A & B, LINE VACUM CHAMBER, DAN LINE DRAIN WATERBOX CONDENSOR DALAM RANGKA ADDITIONAL JOB SIMPLE INSPECTION UNIT 2 PLTU PUNAGAYA

20.01.2023
|
0 Comments
|
Januari 2023

This post is also available in: Indonesian

DOWNLOAD FILE : 103.peng.22

Leave a Reply

Your email address will not be published. Required fields are marked *