This post is also available in: Indonesian
MoU PT PJB with PT PJBS On Procurement Guidelines Critical Assignment Part with Pattern Stockists For Power Plant Project Acceleration / Fast Track Project Phase 1 (FTP-1)
On 25 November, PT Generation Java-Bali (PJB) and PT Generation Java Bali Services (PJBs) signed on Procurement Guidelines Critical Assignment Part with Pattern Stockists for Power Plant Project Acceleration / Fast Track Project Phase 1 (FTP-1). The signing was attended by Amir Rosidin (President Director of PT PJB), Muljo Adji (Director of Development & Commerce PT PJB), Monoarfa Day (President Director of PT PJBs), Bambang Anggono (Stockist Senior Manager PT PJB).
Stockists PJB can serve PJBs in procurement with the procurement system as well as in the existing procurement process, aiming to facilitate coordination between CHD and PJBS in managing FTP-1 are still in the realm of manufacturing so as to enter Indonesia can be fixed through the door so PJBs to forward to further develop and can provide better performance.
With this coordination also PJB and PJBs can show that CHD and PJBs manufacturer can be fused, thus providing a positive signal to pabrikan.Stockist CHD is also expected to maintain the quality of the goods so that the goods ordered will indeed meet the established criteria.